+ Reply to Thread
Results 1 to 7 of 7

Thread: Bonding

  1. #1
    Join Date
    Nov 2006
    Location
    RI
    Posts
    43

    Default Bonding

    Featured Sponsor

    Do any other systems specs (beside national grid) require all hardware on hendrix (distribution spacer cable) construction to be bonded and grounded? Seems foolish to be grounding the stand-off bracket (chicken wing) that cut outs are mounted on.

  2. #2
    Join Date
    Apr 2005
    Location
    Ca
    Posts
    384

    Default Bonding

    Out here in California they bond pins and cutout brackets,,,to me its just a bomb waiting to go off! Nothing like going phz to phz on purpose huh? But I'am just an ape according to my current lineman I dont know nuttin'!!!E.S.

  3. #3
    Join Date
    Sep 2003
    Location
    massachusetts
    Posts
    275

    Thumbs up Bonding

    Billg, can't agree with you more. my company contracts to the grid. As far as I am concerned this bonding issue they have is nothing more than a new version of a widow maker!!

  4. #4
    Join Date
    Apr 2005
    Location
    Western Australia
    Posts
    955

    Default

    How well does the bonding in the US prevent poletop fires? I did ask this question a year or so ago and got some great info as the first rains after summer we seem to get a thorough run of poletop fires. There is a fair amount of linewashing going but its still happens . Another I asked ages ago is if you bond your 3 high voltage phases together you are effectively putting a single phase conductor in a three phase magnetic field so is the induced voltage going to be AC or DC? Electrical theory states you cannot induce a DC voltage but when you are inducing voltage from 3 phases there will always be some part of the sinewave in the positive which is a characteristic of DC. I love throwing this at engineers then stand back and watch them argue did the same thing from memory the last time i asked it on here..

  5. #5
    Join Date
    Dec 2006
    Location
    North Carolina
    Posts
    117

    Thumbs down Bonding

    Here in the south. Some co-ops do,some don't. Some elec. cities do. some don't. Don't you hate when those split nuts are about 30 years old and they decide they want to keep 'em. How about those 301 or 302? snip snip

  6. #6
    Join Date
    Nov 2006
    Location
    RI
    Posts
    43

    Default

    Yeah, that's my sentiment Stinger. Just another big hazard added to primary zone. (Can't argue with engineers though, they got it all figured out...on paper, that is.)

  7. #7
    Join Date
    Oct 2005
    Location
    southwest florida
    Posts
    74

    Cool more

    Featured Sponsor

    hi billy,you should see here. we bond all the guys and all transformer poles. we bond everything on all cement poles,and i mean all the hardware on them,but don't bond the guts on the beach or the guys will corrode faster. just little stuff that you need down on this system. you should see all the cement poles. customers love the way they look,but they suck to drill and when they rust and start to fall apart, you can't get to them fast enough. we have an ongoing fight about should we replace them with wood or with new concrete. i say wood and screw the customer,we work on them. see you this summer. call me when you can.

+ Reply to Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts