Thread: Temp service

  1. Default Temp service

    Featured Sponsor

    How does your company look at the practices for running temp services on the ground if you have a faulted urd service? Do you run the temp, do you locate and work now?

  2. #2

    Default

    Quote Originally Posted by rcdallas_ View Post
    How does your company look at the practices for running temp services on the ground if you have a faulted urd service? Do you run the temp, do you locate and work now?
    Many places do it differently....I found that out long ago.They dont do it like we do....Ive ran thousands of temp bypasses...for a charge the company will run the customer one until they can get an electrican to run them new urd drops.Close to 99% of urd drops belong to the customer here .Other places offer other ways to give the customer 240 volts. Did that kind of answer your question?

  3. #3
    Join Date
    Mar 2003
    Location
    Jersey
    Posts
    2,512
    Blog Entries
    1

    Default

    If there are 2 good legs they'll have us set a service saver. If no 240 appliances they have us jumper the meter pan, otherwise find and repair. All services here are utility owned.
    "It is not the critic who counts:The credit belongs to the man who is actually in the arena" Teddy Roosevelt

  4. #4

    Default

    Like Labor said if we identify one bad leg we usually install a power temp ( dry transformer ) if more than that we will get out the pulsar secondary fault locator and find it and dig it up and fix it, if it's under asphalt we will try to run a service on top of the ground usually in pvc conduit till we can get back out in the daylight to get it fixed.

  5. #5
    Join Date
    Jan 2012
    Location
    New York, Long Island
    Posts
    343

    Default

    we've done both. If the entire service is out we will install a temp on the ground and send a crew out the next day to repair. If it's just one leg or a neutral we'll install an Auto...
    "Never tell people how to do things. Tell them what to do and they will surprise you with their ingenuity."

  6. #6
    Join Date
    Sep 2009
    Location
    ireland/ Dublin
    Posts
    2,119

    Default Why not

    Why not do what we do ? . If ya can't repair it. We give them a generator until we can fix it.
    IF IT WASN'T FOR BAD LUCK WE WOULD HAVE NO LUCK AT ALL. !

  7. #7

    Default heres why

    Quote Originally Posted by bren guzzi View Post
    Why not do what we do ? . If ya can't repair it. We give them a generator until we can fix it.
    Too often Ive seen this happen,and this is one center only...say the cable contractors have been trenching in a subdivision....a month goes by and you have decent rain....urd drops go south due to being cut or the insulation is cut....In a weeks period of time that one center can install 80-100 bypasses,cause you still have the normal amount of drops going bad...You would spend more time delivering and recovering the generators,which would mean nothing gets fixed...now you need not forget that this is the States....once the thieves find out,they would take them anyway.Thats how bad its gotten with no end in sight.

  8. #8
    Join Date
    Mar 2003
    Location
    Jersey
    Posts
    2,512
    Blog Entries
    1

    Default

    Quote Originally Posted by bren guzzi View Post
    Why not do what we do ? . If ya can't repair it. We give them a generator until we can fix it.
    We do that on rare occasions, but if we set a dry transformer, they are sometimes left for months or until one of the other legs go bad......... Generators get stolen quickly......
    "It is not the critic who counts:The credit belongs to the man who is actually in the arena" Teddy Roosevelt

  9. #9

    Default

    Quote Originally Posted by rcdallas_ View Post
    How does your company look at the practices for running temp services on the ground if you have a faulted urd service? Do you run the temp, do you locate and work now?
    Here in Lewisville, we run temp on the ground with bumpers and flexpipe out of the transformer or pedestal into the meter can. Contractors are called to bore a new service which can take a while sometimes leaving the service on the ground for up to a month.

  10. #10

    Default

    Featured Sponsorr

    [QUOTE=rcdallas_;146887]How does your company look at the practices for running temp services on the ground if you have a faulted urd service? Do you run the temp, do you locate and work now?[/QUO
    What do ya'll do?